Pool Feasibility Study
In 2017, Parks & Rec contracted with Water Technologies Inc. (the largest aquatics engineering firm in the US) to conduct a condition assessment of the Aquatic Center. The consultants concluded that many of pool's components have begun to deteriorate or fail and had 3-5 years of useful life left.
What The Report Found:
Plaster chipping & peeling in pool tanks
Brittle & small pipes from the original pool complex built in 1948
Overall Pool Grade = 44.84 out of 100 (failing)
Estimated Facility had 3-5 years of useful life left
Important parts of pool are outdated & failing
Major complications will cause closures & costly repairs
Solution Finding Process:
This group worked with Opsis Architecture to explore replacement options for the facility.
The study was guided through a great deal of community input: stakeholder meetings, focus groups, tabling events, open houses, Spanish foucs groups, surveys, and presentations with local civic groups, organzations, user groups, and surveys.
The detailed reports can be found below:
Aquatic Center Condition Summary
Water Technology Inc. Condition Report
Aquatic Center Feasibility Study